Siding Calculator

Lay a wall out in courses rather than area, including the ripped top course under the eave.

Your walls

The wall

Walk the outside of the house and add the faces. On a plain rectangle this is the perimeter, so a 30 by 40 house is 140 feet. Gables are triangles and are easiest added separately as half the base times the height.
Measure the sided height, not the storey height. It runs from the bottom of the starter strip to the underside of the eave, which on a single storey is usually a little more than the ceiling height inside.
A garage door is several of these. A 16 by 7 door is worth about five, so enter it that way rather than as one.
Deducting windows lowers the material but not the labor, because every one of them adds cuts. That is what the waste allowance above is for.

The siding

This is the number in the product name, not the width of the piece. Double 5 vinyl shows 5 inches per course. An 8.25 inch fiber cement plank is normally hung at 7 inches, because the course above laps the rest.
A plank is one. Vinyl profiles are named for this: Double 4 and Double 5 are two courses on one panel, Triple 3 is three. Getting it wrong doubles or halves the piece count without changing the squares.
Vinyl is usually 12 feet 6 inches, which is 12.5 here. Fiber cement and engineered wood planks are normally 12 feet. Oversized vinyl runs longer and is worth using on a long wall because it removes seams.
A square is 100 square feet. Most vinyl cartons hold 2 squares: a Double 4 carton is 24 panels of 8 inches by 150 inches, which is exactly 200 square feet. Fiber cement is often sold by the piece, in which case set this to the coverage of one piece.
Vinyl locks the exposure into the panel, so the leftover has to be ripped off the top course. Lap siding, fiber cement and wood only set a maximum, so the courses can be closed up until they divide evenly into the wall.
Closing the courses up hides more of each plank and costs more material. The floor is set by the plank: it has to keep the minimum headlap the manufacturer requires over the course below.
The ceiling is the plank width less the minimum headlap. An 8.25 inch plank needing 1.25 inches of lap tops out at 7 inches, which is why 7 is the number quoted for that size.
CertainTeed suggests adding 10 percent to siding, soffit and accessories on a large job. A plain rectangle with few openings can run nearer 5. Gables, dormers and a lot of windows push it higher, because every cut leaves a piece too short to use. 10.00%
Trim and price
A plain rectangle has four. Every bump out adds two. Inside corners take a different trim and are counted separately by your supplier.
CertainTeed specifies 1 to 1.25 inches on the factory notch for panels 12 feet 6 inches or shorter, the wider lap in cold weather. It only matters on a wall longer than one piece, where it decides whether you get one more seam.
Divide a carton price by the squares in the carton. This prices what you carry off the lot, so it counts whole cartons rather than the exact requirement.
Siding to buy
12 squares
Cartons 6 cartons
Pieces 113 pieces
Squares the wall needs 11.75 squares
Area to cover
1,068 sq ft
Pieces in a square
9.6

The course layout

Courses 22 courses
Set the exposure at 5 in
Top course shows 3 in
How the courses land The top course rips to 3 in under the eave

Trim by the foot

Starter strip 140 ft
Corner posts 36 ft
J channel 200 ft
Utility trim 140 ft

Where the material goes

Wall area 1,260 sq ft
Doors and windows 192 sq ft
Waste allowance 106.8 sq ft
Left over after the job 132 sq ft
One piece covers 10.42 sq ft
Pieces across one course 12 pieces

What it costs

Siding cost $0
Cost per square foot $0.00

Every figure here is a planning estimate, not a professional takeoff. Yields, waste factors and code requirements vary by product, supplier and jurisdiction, so confirm quantities against the manufacturer’s data and your local building department before you order.

Generated by Mathterial

Siding is not spread across a wall. It is stacked up it, one course lapping the one below, and the number that runs the whole job is the exposure: how much of each piece still shows once the next course covers the rest. Divide the wall height by that exposure and you almost never land on a whole number. What is left over is a real thing, the ripped top course under the eave, and no amount of square footage will tell you how wide it is. This siding calculator works in courses first and squares second, which is the order the job is actually laid out in.

The wall height decides the layout

Take a nine foot wall, which is 108 inches from the bottom of the starter strip to the underside of the eave, and hang Double 5 vinyl on it. Each course shows five inches. That is 21.6 courses, so you install 22, and the last one gets ripped down to three inches. It is a sliver, it sits at eye level with the soffit, and it is the first thing a siding contractor looks at when they walk up to a house.

Knowing the number in advance is what lets you do something about it. You can shift the starter strip down, you can split the difference by ripping the bottom course instead, or on the right material you can change the exposure so the problem disappears. What you cannot do is discover it on the last day.

A piece is not a course

Vinyl profiles are named for how many courses ride on one panel. Double 5 means two five inch courses on a single ten inch panel, so one piece covers two rows of the wall. This is where most siding counts go wrong: the layout runs on the exposure, the order runs on the face of the whole piece, and they are different numbers. Set the courses per piece to one for a plank and to two or three for a vinyl panel, and both stay correct. The Vinyl Siding Institute’s installation manual is the free industry reference for these profiles, listing the single, double, triple, vertical and Dutch lap families the names come from.

Pieces, squares and cartons

Siding is sold by the square, which is 100 square feet of finished wall. One piece covers its face width times its length, so the pieces in a square fall straight out of the profile:

ProfileFaceLengthOne piece coversPieces in a square
Double 4 vinyl8 in12 ft 6 in8.33 sq ft12
Double 5 vinyl10 in12 ft 6 in10.42 sq ft9.6
Triple 3 vinyl9 in12 ft 6 in9.38 sq ft10.67
8.25 in fiber cement at 7 in7 in12 ft7 sq ft14.29
7.25 in fiber cement at 6 in6 in12 ft6 sq ft16.67

That first row is worth checking against a real carton. A Double 4 box holds 24 panels of 8 inches by 150 inches, which is 200 square feet exactly, or two squares. The arithmetic is not an approximation, it is how the box was designed.

Because siding comes in whole cartons, the last part of the order is a rounding step, and on a small job it is not a small one. A ten foot wall on a shed needs under a square of siding and still leaves with two.

Fiber cement lets you move the exposure

Vinyl locks the exposure into the panel, so the rip is unavoidable. Lap siding does not. James Hardie requires a minimum overlap of 1.25 inches between courses, which sets a ceiling on exposure rather than a fixed value: an 8.25 inch plank tops out at 7 inches, a 7.25 inch plank at 6, a 12 inch plank at 10.75. Anything below the ceiling is allowed, it just uses more material.

That turns the layout into a choice. Switch on the adjustable exposure and the calculator looks for the course count whose exposure sits inside your range and lands closest to the one you wanted. The same 108 inch wall in 8.25 inch plank comes out at 16 even courses of 6.75 inches, a quarter inch tighter than the maximum and with nothing ripped at the top.

The trim is bought by the foot

None of the accessories are priced by the square, and forgetting them is the usual reason for a second trip. Starter strip runs the foot of every wall. Utility trim closes the top course under the eave, so it follows the same run. Corner posts are the number of outside corners times the wall height. J channel goes around every window and door, which means four sides of each opening, not two.

On a 30 by 40 house with nine foot walls, two doors and ten windows, that is 140 feet of starter, 140 feet of utility trim, 36 feet of corner post and 200 feet of J channel. The J channel is the one that surprises people.

How much to add for waste

CertainTeed suggests adding 10 percent to siding, soffit and accessories when estimating a large project, and that is a sensible default. A plain rectangle with few openings runs nearer 5 percent. Gables, dormers and a lot of windows push it higher, because every cut leaves an offcut too short to use somewhere else. Deducting your windows lowers the material but not the labor, which is exactly what the waste allowance is there to absorb.

Siding calculator FAQ

How many courses of siding does a wall take?

Divide the sided height by the exposure and round up. A nine foot wall is 108 inches, so Double 5 at five inches a course takes 22 courses. The calculator works this out from the wall height and the exposure, and tells you how much of the top course will show.

Why is the top course of siding so thin?

Because the wall height almost never divides evenly by the exposure. A 108 inch wall in Double 5 takes 21 full courses of five inches and leaves three, so the top course is ripped to three inches. Vinyl locks the exposure, so the only choice is where the rip lands. Fiber cement and lap siding set a maximum rather than a fixed figure, so the courses can be closed up until they divide evenly.

How do I measure a house with gables for siding?

Add up every wall face and multiply by the sided height. A plain 30 by 40 house is 140 feet of run at nine feet, or 1,260 square feet. A gable is a triangle, so work it out on its own as half the base times the height and add that in. Then take off the doors and windows.

What exposure should I use for 8.25 inch HardiePlank?

Seven inches is the maximum. James Hardie requires a minimum overlap of 1.25 inches between courses, and 8.25 less 1.25 is 7. You can go tighter to make the courses come out even on the wall height, which uses slightly more material but removes the ripped course at the top.

How much J channel and starter strip do I need?

All of the trim is bought by the linear foot, off the shape of the building rather than its area. Starter strip runs the foot of every wall and utility trim closes the top course, so both follow the wall run. Corner posts are the outside corners times the wall height. J channel is all four sides of every opening. On a 30 by 40 house with nine foot walls, two doors and ten windows, that is 140, 140, 36 and 200 feet.