Sand is quoted by the ton and used by the cubic yard, and it is heavy enough that guessing the conversion gets expensive fast. This sand calculator gives you both from the same measurements, and it starts at the bedding depth that paver installations actually call for.
One inch of bedding sand, screeded, and no more
This is the number most paver jobs get wrong, and getting it wrong is a callback rather than a cost overrun.
Bedding sand goes down about one inch, screeded level over a compacted aggregate base. A 20 by 10 foot patio at that depth takes 0.68 cubic yards, or 0.92 tons, roughly $32 at $35 a ton. CMHA’s Construction of Interlocking Concrete Pavements specifies the bedding screeded to an uncompacted nominal one inch.
Thicker feels safer and is not. Sand deeper than about an inch keeps consolidating under load, and the pavers move with it: rutting in the wheel tracks, lippage at the joints, and a surface that has to come up and be relaid. Depth belongs in the compacted base underneath, never in the bedding course.
Going to 2 inches doubles the order to 1.36 cubic yards and 1.83 tons, so the mistake costs you money on the way in as well as on the way back.
Weight moves with the weather
Dry sand runs around 100 pounds per cubic foot, putting a cubic yard at about 1.35 tons. Wet sand runs closer to 120, which is 1.62 tons for the same cubic yard, roughly a fifth heavier.
Yards deliver material in whatever condition it is in that day, and you are charged by weight while the site consumes volume. On a rainy week that gap is real money, and the density field above exists so you can model it rather than absorb it.
Which sand the job needs
- Concrete or sharp sand for paver bedding. The angular grains lock together and hold the screed.
- Polymeric sand for the joints between pavers once laid, which is a separate and much smaller quantity.
- Play sand for sandboxes, washed and screened, at whatever depth the box is built to.
Do not substitute soft building sand into a bedding course. It holds water, it does not interlock, and it is the reason a patio that was flat in spring is not flat by fall.
Ordering it
Bulk delivery beats bags on anything past a few cubic feet, and sand is dense enough that a modest-looking pile is a serious weight. Confirm the truck can reach the tipping point and that the surface will take the load, because a load tipped in the wrong place gets moved twice.
For the compacted aggregate base that goes underneath, the gravel calculator works out that layer, and the concrete calculator covers a slab if you are pouring rather than laying.
Sand calculator FAQ
About one inch of bedding sand, screeded level over a compacted base. A 20 by 10 foot patio needs roughly 0.68 cubic yards, or 0.92 tons, including a 10% allowance. Build depth into the base course, not the sand.
About 1.35 tons for dry sand at 100 pounds per cubic foot. Wet sand runs closer to 1.62 tons for the same volume, roughly a fifth heavier, so moisture matters on any order priced by weight.
Sand deeper than about an inch keeps consolidating under load, so the pavers settle unevenly and develop ruts and lippage. Any additional depth the design needs belongs in the compacted aggregate base below.
Concrete or sharp sand, whose angular grains interlock and hold a screed. Avoid soft building sand, which retains water and does not lock up. Polymeric sand is for the joints after laying, not for the bedding course.